5/19/2012 and 5/20/2012 Final Dye Release REMUS Ops

REMUS operations starting ~1.5 hours before max ebb were conducted during the 5/19 and 5/20 dye releases. ¬†Conditions were rough during the 5/19 mission outside of the inlet and no dye was visible during REMUS ops. ¬†However comparison plots of river Colored Dissolved Organic Matter (CDOM) versus Rhodamine concentrations show that the dye was present, just at low concentrations (~0.5 … Read More