5/19/2012 and 5/20/2012 Final Dye Release REMUS Ops

REMUS operations starting ~1.5 hours before max ebb were conducted during the 5/19 and 5/20 dye releases.  Conditions were rough during the 5/19 mission outside of the inlet and no dye was visible during REMUS ops.  However comparison plots of river Colored Dissolved Organic Matter (CDOM) versus Rhodamine concentrations show that the dye was present, just at low concentrations (~0.5 … Read More